March 31, 2025
The final study for the corridor was completed, including with a traffic analysis for both current and future conditions. This project addresses the short term solutions identified on Page 60 of the final report (the alternatives being implemented are shown on pages 49, 51, and 53 of the report). Read the study, which was commissioned by the Stateline Area Transportation Study.
